| Activity | risk | solution |
| Filming on a road | Although we have used a very quite road there is still a risk of motorvehicles | High visibility clothing to be worn by all production team and actress. |
| Actress barefoot on a road | There may be sharp objects on the road | Actress to wear shoes until filming, prior to which a thorough check of the road will take place. |
| Actress outside in winter for a prolonged period of time with a thin costume. | Prolonged exposure to cold weather is harmful to health | When not being filmedthe actress will be provided with warm winter clothing. |
| Actress being filmed on a cellar floor | There may be sharp objects on the floor | Prior to filming the cellar floor will be cleared of all possible hazards. |
| Spending a lot of time in front of a computer editing | Prolonged periods of time infront of a computer can cause eye problems and headaches | A period of 45 mins maximum computer time will be put in place for each team member per media session |
| Spending a lot of time around charging cameras etc | There is a slight risk of tripping over wires | Make sure the wire is not on the floor and is connected to a power point of atleast waist height |
Friday, 6 January 2012
risk assesment
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment